emelymartinez emelymartinez
  • 01-03-2017
  • Mathematics
contestada

An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

Question 19.19. Which occurred in the United States in the decades after World War II? (Points : 3) the rise of fascism A "red scare" high unemployment economi
CAN I GET SOME HELP PLEASE? THIS IS IMPORTANT!
the meaning of regular polygon
consider the inequality -5(x+7)<-10. write an inequality representing a solution for x.
mrs. Rios put wallpaper border around the room shown below. she used. 72 feet of wallpaper border. what's the unknown side. length.
Can any one help me on this on Iam so stuck on this one Thanks y'all
what is the area of a triangle that has a base of 15 1/4in. and a height of 18in?show work
The given measurements may or may not determine a triangle. if not then state that no triangle is formed. if a triangle is formed, then use the law of sines to
Technological change often stimulates economic activity, sush as the factories that grew out of the Industrial Revolution. Think of what you have learned about
Put an N beside the items or conditions that were negatively affected by the Industrial Revolution and a P beside those that were positively affected. -Physical