reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

What is defination of tangent
Explain why during the presidential election of 1860, none of the southern states voted for president lincoln
what is the SI unit of measure for sound intensity
What percentage of animals are inscets?
Which of the following is NOT a requirement for voting? A. must be at least 18 years by election day B. must be a U.S. citizen C. must vote in the place where
Bias and interpretation can influence my perspective as an observer. True False
which two numbers multiply to a -4 and add to a possitive 10?
many scientists are concerned that the Ogallala aquifer in the united states is being depleted at an alarming rate ? what would most likely be a major effect on
a cereal box can hold 144 cubic inches of cereal. if the box is 8 inches long and 1.5 inches wide how tall is the box?
______have bodies that are tall and thin. a. mesomorphs b. ectomorphs c. endomorphs