nrw7r2fyve nrw7r2fyve
  • 02-11-2020
  • Mathematics
contestada

A painter can finish painting a house in 8 hours. Her assistant takes 10 hours to finish the same job. How long would it take for them to complete the job if they were working together?

Respuesta :

ecamarda ecamarda
  • 03-11-2020

Answer:

4.44

Step-by-step explanation:

8 times 10/8+10

80/18=4.44

Answer Link

Otras preguntas

help need an answer asap i need to pass tomorrow (science)​
In the pyramid above, each triangular face has the same area, and the base MNPQ is a square that measures 8 centimeters on each side. If the length of RS = 6 ce
Can someone help me with this?
The food we eat provides the needed for life functions.
2. Here is a polygon. Draw a scaled copy of the polygon using a scale factor of 3. A B D- с c A man har
does soil respond to stimuli?
derive the formula v= u+ atplease derive in detail ​
The Ocean Sea was___. A: The body of waters that separated the Americas from Europe. B: Another name for the Atlantic Ocean. C: Another name for the Pacific Oc
5.346 - 2.289= ? SHOW WORK WILL GIVE BRAINLIEST PLEASE
What is the inverse of the function f(x) = 2x – 10? O h(x) = 2x-5 Oh(x) = 2x + 5 Oh(x) = Ix-5 x) = {x+5 Oh(x) =