alynaislate
alynaislate alynaislate
  • 01-10-2020
  • Physics
contestada

An apple weighing 1.0 N is lifted 3 m. How much work has been done?

Respuesta :

shimbi
shimbi shimbi
  • 03-10-2020

Answer:

work done is given by force multiply by distance.

convert 3m to cm which is 300cm

then W=Fxd

1.0N300cm

W=300J

Answer Link

Otras preguntas

how many moles of NaCl are equivalent to 15.6g NaCl
Part 1: find the slope of the line that passes through the points (2, 1) and (2, 0). part 2: in two or more complete sentences, explain why it is not possible t
can you guys help me with this simple math problem ?
3m2+7=55 answer please
A student is conducting an experiment to determine how far a ball will roll down a ramp based on the angle of incline. What are the independent and dependent
What physical properties must the substances in a mixture have to use filtration to seperate the substances?
What transportation technology made getting around in cities easier in the mid to late 1800s? A. Automobiles B. Cable cars C. Gondolas D. Horses
Explain how an enlargement or a reduction in the dimensions of a building would cause a change in the scale factor.
A fitness contract is a/an A. evaluation of strength, flexibility, endurance, and proper nutrition. B. written document stating an individual's
What is the main reason night driving is more difficult than daytime driving?