jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

What are the two most reactive groups of elements in the periodic table?
The majority of states that did not ratify the Equal Rights Amendment were located in the A. Southeast. B. West. C. Northeast. D. Midwest.
Word: retrospective Need an Antynm Answers: A. forward-looking. B. modest C. fearful D. inward-looking E. delightful
how was the Neolithic period different from the Paleolithic period?
Work and power are different because (2 points) work involves force and distance while power involves force and velocity. work involves distance and mass while
In 1713 how much of North America was an Independent country?
how does the circulatory system rely on the respiratory system
solve inequality and graph 3<-5n+2n
What was the Safavid empire known for? A. The empire had a carefully organized legal code and a well-trained army. B. The inhabitants of the empire experienced
What is .49735 written in scientific notation