23gantaak
23gantaak 23gantaak
  • 04-04-2019
  • Mathematics
contestada

BRAINLIEST ANSWER: Two workers finished a job in 7.5 days. How long would it take each worker to do the job by himself if one of the workers needs 8 more days to finish the job than the other worker?

Respuesta :

akeel5
akeel5 akeel5
  • 04-04-2019

Answer:

first we must times 7.5 into 8 to find out what the answer is,

the answer is 60

Answer Link

Otras preguntas

I’ll give BRAINLIEST if correct
18 What is the perimeter of this shape? 7 cm 7 cm 7 cm cm 7 cm 7 cm 7 cm
Find the Slope Using the slope equation
If I open a business to serve blind people then design the interior to be akin to an obstacle course, am I cruel? I’m graduated so my points are up for grabs ca
At the market, almonds cost $0.51 per ounce. How much does a bag of almonds cost if it weighs 1.6 ounces?
any g,,,irl can be my bestie forever​
m r co m p re ssmy prev acc got banned and this is my new acc...im a boy of 19
Why is Britney Spears insane? I’m graduated so my points are up for grabs cause I’ll never use them. I have to at least as a question with it though.
70 POINTS!!!! This is my fourth time asking, PLEASE HElP!!! What is the domain of the following points?(The following points are on the image below) A {-7, 3, 7
What measurement could be the length of a pool?